[1]
M. A. K. A. Al-Janaby, “Advanced Systems of Planning and Scheduling and the Limitations of their Implementation: A Study Case of Al kufa Old Cement Factory”, JBMS, vol. 6, no. 2, pp. 01–16, Mar. 2024, doi: 10.32996/jbms.2024.6.2.1.